Customization: | Available |
---|---|
After-sales Service: | Engineers to Assist Remote Installation and Use. |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TCA Series Scroll Type Air Chillers
Model | TCA-5 | TCA-10 | TCA-12 | TCA-15 | TCA-20 | TCA-24 | TCA-30 | TCA-36 | |
Cooling Capacity | KW | 15 | 30 | 36 | 49 | 61 | 72 | 91.8 | 108 |
KCAL/HR | 12900 | 25800 | 30960 | 42140 | 52460 | 61920 | 78948 | 92880 | |
BTU/HR | 51180 | 102360 | 122832 | 167188 | 208132 | 245664 | 313904 | 368496 | |
Compressor Type | Scroll Type | ||||||||
Number of Compressors | Set | 1 | 2 | 1 | 2 | 2 | 2 | 3 | 3 |
Compressor Total Power | HP | 5 | 5x2 | 12 | 7.5x2 | 10x2 | 12x2 | 10x3 | 13x2 |
Refrigerant | R22 | ||||||||
Refrigerant Filling Quantities | KG | 2.3 | 4.6 | 5 | 9 | 10 | 11 | 15 | 16 |
Refrigerant Control Mode | Capillarity Tube | Expansion Valve | |||||||
Evaporator Type | Straight Tube Array | ||||||||
Water Tank Capacity (Evaporator) | L | 80 | 150 | 190 | 290 | 290 | 290 | 450 | 450 |
Chilling Water Flow(Evaporator) | L/MIN | 110 | 200 | 350 | 350 | 350 | 650 | 650 | 900 |
Condenser Type | Fin Style Air-Cooled | ||||||||
Blower Power ( Condenser) | KW | 0.38 | 1 | 1.9 | 2 | 2 | 3.8 | 5.7 | 5.7 |
Numberof Blower | PCS | 2 | 2 | 2 | 4 | 4 | 4 | 6 | 6 |
Single Blower Power | KW | 0.19 | 0.5 | 0.95 | 0.5 | 0.5 | 0.95 | 0.95 | 0.95 |
Number of Cooling Water lnlet/Outlet | Group | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 |
Cooling Water Inlet/Outlet Size | MM | 25 | 40 | 50 | 50 | 50 | 50 | 75 | 90 |
Water Tank Capacity | L | 80 | 150 | 190 | 290 | 290 | 290 | 450 | 450 |
Pump Power | HP | 1 | 2 | 3 | 5 | 7.4 | |||
Pump Flow | L/MIN | 110 | 200 | 350 | 350 | 350 | 650 | 650 | 900 |
Pump Maximum Lifts | M | 17 | 16 | 18 | 18 | 18 | 18 | 18 | 18 |
Power Supply | 3P 380VAC, 50Hz | ||||||||
Control Voltage | 1P 220VAC, 50HZ | ||||||||
Total Power | KW | 4.9 | 10 | 12.5 | 16.2 | 19.2 | 24 | 28.7 | 38.5 |
Machine Dimensions | L(MM) | 1230 | 1530 | 1600 | 1600 | 1600 | 1600 | 2400 | 2400 |
W(MM) | 650 | 760 | 860 | 1400 | 1400 | 1480 | 1400 | 1480 | |
H(MM) | 1470 | 1650 | 1980 | 2000 | 2000 | 2120 | 2120 | 2120 | |
Machine Weight | KG | 120 | 380 | 450 | 750 | 800 | 900 | 1100 | 1300 |
1. To employ high precision temperature controller which can accurately control water temperature 5~35ºC , precision up to ± 1ºC .
2. To employ fin style air-cooled condensers with features of rapid heat transmission and excellent heat dispersion. Cooling water no need to be required.
3. The cooling air of the air chiller is inhaled from the side of the fuselage and the top discharge effectis.
4. To adopt imported superb compressor and water pump, stable performance, power saving, durable service life and low noise.
5. 304 stainless steel insulated water tank with durable service life, easy to clean and maintenance.
6. Complete safety devices including power reverse phase& power short phase and anti-freeze protection.
7. To adopt High efficiency tube-in-shell evaporator and seamless spiral copper tube, long service life, ensure good water quality.
8. Standard equipped with RS485 communication interface that can realize automatic centralized monitoring.
9. The temperature of the ultra-low temperature chiller can reach below -15ºC (option).
10. Chillers for anti-alkaline& anti-acid type can be customize.
Mainly used in mold cooling of the plastic industry, shorten the molding cycle, accelerate the product shape, so as to improve product quality. At the same time, it is also widely used in other industries that need cooling, such as electroplating, food, electronics industry and ultrasonic machinery cooling.
One to One Application
One to Many Application
Tongyi originated from Taiwan, in order to meet the needs of mainland customers, in April 1999, the company set up an assembly plant in Dongguan of the Pearl River Delta, and began to sell some of its products to the Pearl River Delta market. Adhering to the purpose of "excellence, quality first", the company is committed to the research and development of intelligent automation equipment innovation, intelligent manufacturing and the whole plant planning, to provide intelligent factory overall solutions, is a professional engaged in intelligent automation equipment, design, research and development, production, sales and service in one of the intelligent manufacturing high-tech enterprises.
In order to meet the needs of customers in the YangtzeRiver Delta, in August 2011, we established an assembly plant in Suzhou of Yangtze River Delta. With abundant manufacturing experience and high-quality service, we provide customers with intelligent manufacturing automation equipment for the whole plant. With the rising costs in mainland China and the relocation of some manufacturing plants, adhering to the concept of always serving customers, we established a company in Hanoi, Vietnam, Southeast Asia, in May 2017, to provide overseas customers with the whole plant planning, technical support, talent training and plant construction and production needs.
Tongyi has always been customer-centric, with talent and technical advantages to assist customers from stand-alone automation system, system automation to intelligent automation production development needs. In addition, it has 6 production bases at domestic and abroad, including 2 in South China, 1 in Central China, 2 in East China, and overseas Vietnam, and has set up a number of holding companies in the country, many service bases to provide customers at domestic and abroad with better and more immediate service, fast processing to meet customer needs, and create value for customers.
Q: Are you a manufacturer?
A: Yes, we have seventeen years experience in equipment manufacturing.
Q: Do you support OEM?
A: Yes, we have our own brand, and also support ODM, OEM.
Q: How about your warranty?
A: All of our products for one years warranty.
Q: How about your average lead time?
A: Peak Season Lead Time: within 15 workdays. Off Season Lead Time: within 15 workdays.
Q: What's your payment term?
A: The payment term is 70% prepayment, 30% balance before delivery.